Comprehensive preparation for dry dock entry including pre-operation verification, critical systems shutdown, and power transition from main generators to emergency power.

Pre-Operation Verification

# Action Status
1
Arrival Checklist
COMPLETED
2
Tank Contents
LOGGED
3
Wastewater Tanks at Minimum Level
MAINTAINED
4
Vessel at Even Keel, Trim and List Zero
VERIFIED

Initial Systems Shutdown After Keel on Dock

# Action Status
5
ICCP and Cathodic Protection
OFF
6
Hamann System
OFF
7
Chilled Water System
OFF
8
Shaft Cooling Pumps
OFF
9
Emergency Generator
READY
10
Non-Essential Consumer Load
MINIMISED

Power Transition to Emergency Generator

# Action Status
11
Generator Load to Single Unit
SET
12
Generators to Manual Mode
SET
13
Emergency Generator
ONLINE
14
Online Generator Circuit Breaker
OPEN
15
Main Generator
OFF
16
Central Cooling Sea Water Pumps Manual
OFF
17
Central Cooling Generator Pumps Manual
OFF
18
Stabilisers Manual Pin
LOCKED

Shore Power Connection Preparation

# Action Status
19
Emergency Switchboard Link
ON
20
Shore Cooling Water
CONNECTED
21
Shore Power Cable
CONNECTED
22
Air Conditioning Sea Water Pump Breakers
OFF
23
Shore Power Breakers
ON
24
Shore Power Push Button
ON
25
Emergency Generator Link Key
NORMAL