# 10 - Dry Dock Entry

### Pre-Operation Verification

```checklist
1. [ ] Arrival Checklist ......................... COMPLETED
2. [ ] Tank Contents ................................ LOGGED
3. [ ] Wastewater Tanks at Minimum Level ........ MAINTAINED
4. [ ] Vessel at Even Keel, Trim and List Zero .... VERIFIED
```

### Initial Systems Shutdown After Keel on Dock

```checklist
5. [ ] ICCP and Cathodic Protection .................... OFF
6. [ ] Hamann System ................................... OFF
7. [ ] Chilled Water System ............................ OFF
8. [ ] Shaft Cooling Pumps ............................. OFF
9. [ ] Emergency Generator ........................... READY
10. [ ] Non-Essential Consumer Load ............... MINIMISED
```

### Power Transition to Emergency Generator

```checklist
11. [ ] Generator Load to Single Unit ................... SET
12. [ ] Generators to Manual Mode ....................... SET
13. [ ] Emergency Generator .......................... ONLINE
14. [ ] Online Generator Circuit Breaker ............... OPEN
15. [ ] Main Generator .................................. OFF
16. [ ] Central Cooling Sea Water Pumps Manual .......... OFF
17. [ ] Central Cooling Generator Pumps Manual .......... OFF
18. [ ] Stabilisers Manual Pin ....................... LOCKED
```

### Shore Power Connection Preparation

```checklist
19. [ ] Emergency Switchboard Link ....................... ON
20. [ ] Shore Cooling Water ....................... CONNECTED
21. [ ] Shore Power Cable ......................... CONNECTED
22. [ ] Air Conditioning Sea Water Pump Breakers ........ OFF
23. [ ] Shore Power Breakers ............................. ON
24. [ ] Shore Power Push Button .......................... ON
25. [ ] Emergency Generator Link Key ................. NORMAL
```