09 - Bunkering Operations

Active monitoring and control procedures during fuel transfer operations ensuring safe pumping rates, proper distribution, and continuous system surveillance.

System Operation and Flow Control

# Action Status
1
Biocide System Running and Pump Rate
SET
2
Pumping Initiated at Minimum Rate
AGREED
3
Distribution to Correct Tank
VERIFIED
4
Closed Tank Levels Steady
VERIFIED
5
Pump Rate Adjusted to Maximum Rate
SET
6
Minimum Rate When Tank Isolation
IMPLEMENTED

Continuous Monitoring Requirements

# Action Status
7
Communication and Deck Watch
MAINTAINED
8
Tank Levels at All Times
MONITORED
9
Overflow Side Glass
CHECKED
10
Trim and List for Even Keel
MONITORED

Final securing procedures and documentation completion following fuel transfer operations ensuring system integrity and regulatory compliance.

System Securing and Disconnection

# Action Status
11
Hose Drained and Blown Through
COMPLETED
12
Filling Valves
CLOSED
13
All Remote Controlled Valves
CLOSED
14
Filling Hose
DISCONNECTED
15
Bunker Station
BLANKED

Verification and Documentation

# Action Status
16
Supplier Meter Versus Tank Level
COMPARED
17
Fuel Samples
OBTAINED
18
All Receipts and Certificates
RECEIVED
19
Vessel Load Line
CHECKED

Final Actions and Records

# Action Status
20
Completion
BRIDGE INFORMED
21
Red Bravo Flag
LOWERED
22
Bunkering in Oil Record Book
LOGGED
23
High and Low Level Alarms
RESET