Engine

08 - Bunkering Preparation

Comprehensive preparation for fuel loading operations ensuring safety protocols, equipment readiness, and regulatory compliance prior to fuel transfer commencement.

Planning and Communication

# Action Status
1
Bunker Loading Plan
AGREED
2
Duty Bridge Officer
ADVISED
3
Red Flag Display
RAISED
4
Vessel Stability and Moorings
VERIFIED
5
Ship, Shore and Barge Communication
TESTED
6
No Smoking Signs
DISPLAYED

Safety and Environmental Preparation

# Action Status
7
Foam Extinguishers at Bunker Station
READY
8
Scuppers on Bunkering Side
PLUGGED
9
Opposite Bunker Station
BLANKED
10
SOPEP Kit at Bunkering Station
READY

Tank and System Configuration

# Action Status
11
Fuel Tank High Level Alarm to 90%
SET
12
Overflow Tank
EMPTY
13
Overflow Alarm
TESTED
14
All Fuel Tank Levels
LOGGED
15
All Remote Control Valves
TESTED
16
All Valves in Correct Position
CHECKED
17
Fuel Separator Link to Main Manifold
CLOSED
18
Vessel Fuel Meter
RESET
19
Biocide System
FILLED

Equipment and Documentation Verification

# Action Status
20
Filling Hose and Connection Integrity
CHECKED
21
Filling Hose
SECURED
22
Bunkering Delivery Note
AVAILABLE
23
Quality and Quantity Fuel Agreement
CHECKED
24
Pumping Rate
AGREED
25
Supplier Emergency Stop Procedure
AGREED
26
Supplier Fuel Meter
CHECKED
27
Supplier Fuel Tanks
INSPECTED
28
Bunkering Team Members
BRIEFED