Yachting Concept Monaco Logo
Engine

07 - Watch in Port

Comprehensive verification of cooling systems, lubrication levels, air systems, and safety equipment following basic watch handover completion.

Cooling and Water Systems

# Action Status
1
Sea Water Pump Pressure
CHECKED
2
Heat Exchanger Temperature
CHECKED
3
FW Boiler Temperature and Pressure
CHECKED
4
Chilled Water Temperature and Pressure
CHECKED

Lubrication and Oil Systems

# Action Status
5
Air Compressor Oil Level
CHECKED
6
Screw Shaft Oil Tank Level
CHECKED
7
Generators Oil and Coolant Levels
CHECKED
8
Air Conditioning Compressor Oil Level
CHECKED

Air and Ventilation Systems

# Action Status
9
Air Reservoir Water
DRAINED
10
All AHU and Exhauster from ECR Panel
RUNNING
11
Sewage Jet Pumps Vacuum
CHECKED

Electrical and Emergency Systems

# Action Status
12
Engine and Generator Batteries
CHECKED
13
Emergency Generator
AUTO MODE

Safety Systems Verification

# Action Status
14
Fire Alarm System
CLEAR
15
Sprinkler Alarm System
CLEAR
16
Sprinkler System Pressure
CHECKED

Final Configuration

# Action Status
17
Monitoring System to UMS Mode
SET
18
Engine Logbook
FILLED