Yachting Concept Monaco Logo
Emergency

06 - Collision

Immediate response procedures for vessel collision.
COLLISION RESPONSE PRIORITIES:
  • Offer assistance to other vessel if capable
  • Minimise pollution from both vessels
  • Consider vessel stability and withdrawal if embedded

Immediate Primary Actions

# Action Status
1
Main Engines
STOPPED
2
Master
CALLED
3
Chief Engineer
CALLED
4
General Alarm
SOUNDED
5
Watertight Doors
CLOSED
6
Guests and Crew
MUSTERED
7
Response Team for Damage Control
READY
8
Electrical Power in Affected Area
ISOLATED
9
Location and Extent of Flooding
ESTABLISHED
10
Water Ingress Rate
ESTIMATED
11
Bilge Pump using OWS
STARTED

Follow-up Emergency Actions

# Action Status
12
Damage Control Plan
DEPLOYED
13
Flooding Effects on Stability
ESTIMATED
14
Pollution Prevention per SOPEP Manual
READY
15
Head Count
EXECUTED
16
Abandon Ship Procedure if Required
IMPLEMENTED
17
Survival Craft and LSA
READY

Communication and Position Recording

# Action Status
18
Communication with the Other Vessel
ESTABLISHED
19
MRCC and Nearby Vessels
ALERTED
20
DPA and Company for Assistance
CONTACTED
21
Position On the Chart
FIXED
22
Pictures and Movies
TAKEN
23
Time And Events
CONTINUOUS