Engine

02 - Departure

Systematic preparation of propulsion and power generation systems for departure operations including shore connection

Systems Pre-Start Configuration

# Action Status
1
Bridge Team One Hour Notification
NOTIFIED
2
Main Engine Controls
LOCAL
3
One Generator
RUNNING
4
Shaft cooling pumps
AUTOMATIC
5
Shore Power Converter Switches
OFF
6
Shore Power Cable
DISCONNECTED
7
Shaft Cooling Pumps to Automatic Mode
SET

Power and Propulsion Systems Startup

# Action Status
8
All Generators
STARTED
9
All Generator Parameters
CHECKED
10
Generators in Manoeuvring Mode
SET
11
Bow Thruster Activation
REQUESTED
12
Thrusters and Steering from Bridge
TESTED
13
Main Engines
STARTED
14
Override Mode as Bridge Requests
SET
15
Main Engine Parameters
CHECKED
16
ER Ventilation Negative Pressure
ADJUSTED
17
Engine Control to Bridge
TRANSFERRED