Engine
03 - Cruising
Optimisation of engine room and power generation systems for efficient open sea cruising operations following departure
Power and Propulsion Systems
| # | Action | Status | |
|---|---|---|---|
| 1 | Single Generator Operation | SET | |
| 2 | Main Engine Cruising RPM | SET | |
| 3 | One Steering Pump Operation | CHECKED | |
| 4 | Bow Thruster System | OFF | |
| 5 | Stabilizer Systems | ENGAGED | |
| 6 | Generator Parameters | CHECKED |
Fuel and Cooling Systems
| # | Action | Status | |
|---|---|---|---|
| 7 | Fuel Separator | RUNNING | |
| 8 | Daily Tank Levels | MONITORED | |
| 9 | Sea Water Cooling System | CHECKED | |
| 10 | Engine Room Ventilation | ADJUSTED | |
| 11 | Heat Exchanger | CHECKED |
Monitoring and Safety
| # | Action | Status | |
|---|---|---|---|
| 12 | Engine Room Monitoring System | ACTIVE | |
| 13 | Bilge Levels | CHECKED |
Communication and Documentation
| # | Action | Status | |
|---|---|---|---|
| 14 | Bridge Communication | MAINTAINED | |
| 15 | Engine Room Log Book | UPDATED |
Departure
Systematic preparation of propulsion and power generation systems for departure operations including shore connection
Pre-arrival
Systematic preparation of engine room systems for arrival operations and port manoeuvring including power configuration, environmental compliance, and propulsion readiness.

