Yachting Concept Monaco Logo
Emergency

04 - Grounding

Immediate response procedures for vessel grounding.

Immediate Primary Actions

# Action Status
1
Main Engines
STOPPED
2
Master
CALLED
3
General Alarm
SOUNDED
4
Watertight Doors
CLOSED
5
Guests and Crew
MUSTERED
6
Personal Injuries
ASSESSED

Damage Assessment and Control

# Action Status
7
External Damages
ASSESSED
8
Possible Leakage, Tank Soundings
CHECKED
9
Response Team Stand-by for Integrity
READY
10
Bilge Pumps
STARTED
11
Damage Control if Required
STARTED
12
Oil Pollution Prevention Measures
IF REQUIRED

Communication and Position Recording

# Action Status
13
Distress Message if Required
TRANSMITTED
14
DPA and Company for Assistance
CONTACTED
15
Exact Position and Heading on Chart
FIXED
16
Exact Grounding Time
RECORDED

Environmental and Re-floating Assessment

# Action Status
17
Sketch Soundings Around Vessel
COMPLETED
18
Tide Table for High and Low Water
CHECKED
19
Weather Forecast, Wind and Current
ASSESSED
20
Risk of Waves and Current
EVALUATED
21
Re-float Attempt Strategy
ESTIMATED

Documentation

# Action Status
22
Position On the Chart
FIXED
23
Time And Events
LOGGED
24
Grounding Emergency Response
LOGGED
25
DPA and Company for Assistance
CONTACTED