Yachting Concept Monaco Logo
Engine

12 - Undocking

Complete systematic vessel launch procedure ensuring all machinery, safety systems, and sea connections are properly configured for safe water entry and initial operations. This checklist covers pre-launch preparations through post-launch verification.

Pre-Launch Shore Operations

# Action Status
1
Briefing With Shipyard And Captain
COMPLETED
2
Machinery Breakers
TAGGED OFF
3
Main Engine And Gearbox Cooling Systems
FILLED
4
All Seacock Valves
CLOSED
5
Air Conditioning Seawater Circuit
FILLED/VENTED
6
Emergency Generator Mode
TO MANUAL
7
All Bilge Wells
DRY/ALARMS CLEAR

Shore Power And Utilities Disconnection

# Action Status
8
Wastewater Shore Discharge Valve
CLOSED
9
Wastewater Hose
DISCONNECTED
10
Fresh Water Hose
DISCONNECTED
11
Air Conditioning Units
OFF
12
Air Conditioning Shore Cooling
DISCONNECTED
13
Shore Power
SWITCHED OFF
14
Shore Power Cable
DISCONNECTED

Vessel In Water - Systems Commissioning

# Action Status
15
Seawater Valves Integrity
CHECKED
16
Main Sea Chest Valves
OPENED
17
Forward Sea Chest Valves
OPENED
18
Central Plate Heat Exchanger
VENTED
19
Seawater Discharge Valves
OPENED
20
Central Cooling Generator Pumps
ON
21
Power Management System
READY
22
Primary Generator
STARTED
23
Main Switchboard Generator
ONLINE
24
Central Cooling Seawater Pump
SET TO AUTO

Main Systems Verification

# Action Status
25
All Circuit Breakers
SWITCHED ON
26
Seawater Pressure Parameters
WITHIN LIMITS
27
Remaining Generators
STARTED
28
Fire And Bilge Pumps
PRIMED/TESTED
29
Shaft Cooling Pumps
PRIMED/TESTED
30
Propeller Shaft Seals
CHECKED
31
Air Conditioning Units
TESTED
32
Main Engine Controls
LOCAL
33
Main Engine Cooling System
SATISFIED
34
Stabilisers Lock Pin
UNLOCK

Final Systems Check

# Action Status
35
Bow Thruster Seals
CHECKED
36
Propeller Shaft Oil Tanks
CHECKED
37
Fin Stabiliser Shaft Seals
CHECKED
38
Steering Gear Shaft Seals
CHECKED