Yachting Concept Monaco Logo
Bridge

08 - Post-Arrival

Systematic shutdown of sea passage systems and reconfiguration for secure port operations following successful berthing or anchoring.

Systematic shutdown of sea passage systems and reconfiguration for secure port operations following successful berthing or anchoring.

Vessel Security and Position

# Action Status
1
Vessel Position Alongside or Stern-to
CONFIRMED
2
Mooring Lines Forward and Aft
SECURED
3
Engine Controls to Idle
CHECKED
4
Main Engines
STOPPED

Propulsion and Manoeuvring Systems

# Action Status
5
Bow Thruster System
OFF
6
Stabiliser Systems
OFF
7
Both Steering Pumps
OFF
# Action Status
8
Both Radar Systems and Displays
OFF
9
ECDIS to Moored Status and Alarms
OFF
10
AIS Status to Moored
SET

Lighting Configuration

# Action Status
11
Navigation Lights
OFF
12
Deck Lights to Port Configuration
ON

Logbook

# Action Status
13
Mooring Details in Log Book
RECORDED
14
Navigation Trip Log Summary
RECORDED
15
Post-Arrival Check Completion
LOGGED