# 07 - Engine Room Familiarisation

## Checklist

Ensure that all personnel that are expected to participate in Engine Room Operations receive complete information and are made aware of his/her responsibilities aboard, particularly those relating to the Safety Management Manual

<table>
<thead>
  <tr>
    <th>
      #
    </th>
    
    <th>
      Safety and Emergency
    </th>
    
    <th>
      ✔︎
    </th>
  </tr>
</thead>

<tbody>
  <tr>
    <td>
      01
    </td>
    
    <td>
      Chief Engineer’s standing orders
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      02
    </td>
    
    <td>
      Fire alarm system
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      03
    </td>
    
    <td>
      Operation of fire pumps and emergency fire pumps
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      04
    </td>
    
    <td>
      Operation of bilge pumps and bilge pumping systems
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      05
    </td>
    
    <td>
      Emergency escapes and obligation to keep them clear at all time
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      06
    </td>
    
    <td>
      Watertight doors & Fire door
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      07
    </td>
    
    <td>
      Detailed instruction in emergency procedures
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      08
    </td>
    
    <td>
      Crew muster list and crew first response actions
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      09
    </td>
    
    <td>
      Steering and emergency steering
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      10
    </td>
    
    <td>
      M.E. emergency stop
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      11
    </td>
    
    <td>
      Automatic sliding doors emergency operation
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      12
    </td>
    
    <td>
      Emergency link procedure emergency-main switchboard
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      13
    </td>
    
    <td>
      Manual operation in case of faulty monitoring system
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      14
    </td>
    
    <td>
      Black-out procedure
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      15
    </td>
    
    <td>
      Generators manual parallel
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      16
    </td>
    
    <td>
      Emergency sprinkler operation/shut-off
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      17
    </td>
    
    <td>
      Guest elevator emergency operation
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      18
    </td>
    
    <td>
      Emergency link galley-laundry electric switchboard
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      19
    </td>
    
    <td>
      Emergency ventilation shut-off
    </td>
    
    <td>
      
    </td>
  </tr>
</tbody>
</table>

<table>
<thead>
  <tr>
    <th>
      #
    </th>
    
    <th>
      Routine procedures
    </th>
    
    <th>
      ✔︎
    </th>
  </tr>
</thead>

<tbody>
  <tr>
    <td>
      20
    </td>
    
    <td>
      Oil water separator, start, stop and operation, test mode and MARPOL regulation knowledge
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      21
    </td>
    
    <td>
      Main engines local operation
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      22
    </td>
    
    <td>
      Waste water system, start and operation (Hamman)
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      23
    </td>
    
    <td>
      Waste water discharge pump, manual and automatic operation
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      24
    </td>
    
    <td>
      UMS rules
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      25
    </td>
    
    <td>
      Required participation for watch keeping at sea, on port, at anchor
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      26
    </td>
    
    <td>
      General COSWP principles and attention to detail on deck
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      27
    </td>
    
    <td>
      Tender launching and recovery
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      28
    </td>
    
    <td>
      Operation of hydraulic hull doors and restrictions
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      29
    </td>
    
    <td>
      Operation of gangway and passerelles controls
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      30
    </td>
    
    <td>
      MARPOL and SOPEP kit
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      31
    </td>
    
    <td>
      HVAC system operation
    </td>
    
    <td>
      
    </td>
  </tr>
  
  <tr>
    <td>
      32
    </td>
    
    <td>
      Logging and log book
    </td>
    
    <td>
      
    </td>
  </tr>
</tbody>
</table>

<signature title="Engineer">

I hereby confirm that I have been briefed and familiarised in all the above.

</signature>

<signature title="Chief Engineer / Master">

I hereby confirm that the crew member listed above have been fully briefed and familiarised in all above issues and I will ensure that he will be further trained in accordance with company’s Safety Management System and any other on board safety training deemed relevant.

</signature>

## Revision History

<revision-history-table>
<table>
<thead>
  <tr>
    <th>
      Version
    </th>
    
    <th>
      Date
    </th>
    
    <th>
      Editor
    </th>
    
    <th>
      Revision History
    </th>
  </tr>
</thead>

<tbody>
  <tr>
    <td>
      1.0
    </td>
    
    <td>
      23 Nov 2021
    </td>
    
    <td>
      Marco Franzini
    </td>
    
    <td>
      Initial Commit
    </td>
  </tr>
  
  <tr>
    <td>
      1.1
    </td>
    
    <td>
      06 Dec 2021
    </td>
    
    <td>
      Marco Franzini
    </td>
    
    <td>
      Add Emergency Items
    </td>
  </tr>
  
  <tr>
    <td>
      1.2
    </td>
    
    <td>
      09 Dec 2023
    </td>
    
    <td>
      Christophe Guegan
    </td>
    
    <td>
      Notion Import & Clarification
    </td>
  </tr>
  
  <tr>
    <td>
      1.3
    </td>
    
    <td>
      07 Apr 2026
    </td>
    
    <td>
      Christophe Guegan
    </td>
    
    <td>
      Renumber Routine procedures to continue from 20 (was restarting at 01)
    </td>
  </tr>
</tbody>
</table>
</revision-history-table>
